Transcribe
Translate
James A. Van Allen lab journal, March 1958-September 1959
Page 274
More information
digital collection
archival collection guide
transcription tips
9/23/59 Our I.G.Y. "Payload 16" has recently been rescheduled for 30 September (following the July failure of the previous attempt) But a recent Canaveral failure of a Jupiter firing resulted in the puncture of the fuel tank of the 19A rocket by shrapnel. Now rescheduled for 13 October 1959. G. Ludwig
Saving...
prev
next
9/23/59 Our I.G.Y. "Payload 16" has recently been rescheduled for 30 September (following the July failure of the previous attempt) But a recent Canaveral failure of a Jupiter firing resulted in the puncture of the fuel tank of the 19A rocket by shrapnel. Now rescheduled for 13 October 1959. G. Ludwig
Van Allen Papers
sidebar